Keeping Accurate Records of Project Progress

video-placeholder
Loading...
강의 계획표 보기

배우게 될 기술

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

검토

4.8개(1,837개 평가)

  • 5 stars
    80.02%
  • 4 stars
    17.31%
  • 3 stars
    2.17%
  • 2 stars
    0.32%
  • 1 star
    0.16%

GV

2020년 9월 9일

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

T

2022년 4월 10일

Excellent course with details. The Instructors are well equiped and has a lot of experience on the Industry. The only problem that i see is they didn't share the reading materials and ppt.

수업에서

The Role of the Scheduler in Construction Management

Jennifer Buermann, of the STV Group, discusses the role of the scheduler in a construction project and how to determine if a project is on track to meet the estimated goals. Also covered are ways to adjust to ensure the project stays on track.

강사:

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Coursera 카탈로그 살펴보기

무료로 참여해 맞춤화된 추천, 업데이트 및 제안을 받아보세요.