Start to Start Relationships

video-placeholder
Loading...
강의 계획표 보기

배우게 될 기술

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

검토

4.8개(1,839개 평가)

  • 5 stars
    80.04%
  • 4 stars
    17.29%
  • 3 stars
    2.17%
  • 2 stars
    0.32%
  • 1 star
    0.16%

T

2022년 4월 10일

Excellent course with details. The Instructors are well equiped and has a lot of experience on the Industry. The only problem that i see is they didn't share the reading materials and ppt.

GV

2020년 9월 9일

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

수업에서

Types of Construction Activity Relationships

This module provides an overview of the types of construction activity relationships encountered in a construction project and how to represent them in an activity precedence diagram.

강사:

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Coursera 카탈로그 살펴보기

무료로 참여해 맞춤화된 추천, 업데이트 및 제안을 받아보세요.